Following First in India
  • Piping work for a single unit 1,000 MW nuclear project for NPCIL. KudanKulam.
  • Revamp the Oldest nuclear reactor in India for 200 MW Madras Atomic power plant, first of its kind in India.
  • Fabricate critical SS vessel for 500 MW fast breeder reactor project at Bhavani, Kalpakkam.
  • Major Boiler Revamp of 200 MW Thermal Power Plant at Obra , U.P
  • Major Revamp and Capacity Enhancement of FCC Unit at Kochi Refinery.
Unique Qualifications & Achievements
  • One of the First to do Large Diameter SS Cryogenic Piping in India.
  • Assembly & Welding 110 MT, 13 mtr Dia SS Nuclear vessel within 3 mm tolerance and 0% weld defect.
  • Recently completed the Abu Dhabi New Airport Fuel Depot Piping with weld repair percentage of less than 1 %

Revamp the Oldest nuclear reactor in India for 200 MW Madras Atomic power plant, Nuclear coolant channel replacement

Assembly & Welding 110 MT, 13 mtr Dia SS Nuclear vessel within 3 mm tolerance and 0% weld defect

One of the First to do Large Diameter SS Cryogenic Piping in India

Recently Completed Abu Dhabi New Airport Fuel Depot Piping with weld repair percentage of less than 1%